PHOTON SOLAR REPOWERING (26INR0718) is listed in the ERCOT interconnection queue as a solar request filed at 0 MW (a net change or energy-only filing) in Wharton County, TX. The filing names Waterh_POI_5 as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, IA”, with a target commercial operation date of August 17, 2027. It records the screening study as complete on December 23, 2025, the full interconnection study as approved on September 23, 2026 and the interconnection agreement as signed on February 25, 2021.
| Queue ID | 26INR0718 |
|---|---|
| Project name | PHOTON SOLAR REPOWERING |
| Status (as published) | SS Completed, FIS Completed, IA |
| Substation | Waterh_POI_5 |
| Point of interconnection | 44880 Waterh_POI_5 345kV |
| County | Wharton |
| State | TX |
| Voltage | 345 kV |
| Capacity | 0 MW (0 MW as filed — net change or energy-only) |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2027-08-17 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Waterh_POI_5 substation: 5 requests in the ERCOT queue, 5 active totaling 757.2 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| 26INR0725 | PHOTON BESS REPOWERING | 305.5 | Battery | SS Completed, FIS Completed, No IA |
| 25INR0493 | PHOTON SOLAR 1 2 SLF | 235.7 | Solar | SS Completed, FIS Completed, IA |
| 23INR0111 | PHOTON SOLAR 3 SLF | 110 | Solar | SS Completed, FIS Completed, IA |
| 25INR0673 | PHOTON SOLAR 4 SLF | 106 | Solar | SS Completed, FIS Completed, No IA |
Wharton, TX: 44 requests in the ERCOT queue, 42 active totaling 8,624.9 MW.
Tracked changes
1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.
| Detected | Change | MW | Status was → now |
|---|---|---|---|
| 2026-10-05 | Status change | n/a | SS Completed, FIS Started, IA → SS Completed, FIS Completed, IA |
Additional filed fields
| Interconnecting entity | GulfStar Power, LLC |
|---|---|
| CDR reporting zone | SOUTH |
| Fuel code | SOL |
| Technology code | PV |
| Interconnection agreement signed | 2021-02-25 |
| Screening study complete | 2025-12-23 |
| Full interconnection study approved | 2026-09-23 |
| Water availability | Not Required |