PHOTON BESS REPOWERING

ERCOT queue ID 26INR0725

PHOTON BESS REPOWERING (26INR0725) is listed in the ERCOT interconnection queue as a 305.5 MW battery project in Wharton County, TX. The filing names Waterh_POI_5 as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, No IA”, with a target commercial operation date of August 17, 2027. It records the screening study as complete on December 23, 2025 and the full interconnection study as approved on September 23, 2026.

Queue ID26INR0725
Project namePHOTON BESS REPOWERING
Status (as published)SS Completed, FIS Completed, No IA
SubstationWaterh_POI_5
Point of interconnection44880 Waterh_POI_5 345kV
CountyWharton
StateTX
Voltage345 kV
Capacity305.5 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2027-08-17
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Waterh_POI_5 substation: 5 requests in the ERCOT queue, 5 active totaling 757.2 MW.

Queue IDProjectMWResourceStatus
25INR0493PHOTON SOLAR 1 2 SLF235.7SolarSS Completed, FIS Completed, IA
23INR0111PHOTON SOLAR 3 SLF110SolarSS Completed, FIS Completed, IA
25INR0673PHOTON SOLAR 4 SLF106SolarSS Completed, FIS Completed, No IA
26INR0718PHOTON SOLAR REPOWERING0SolarSS Completed, FIS Completed, IA

Wharton, TX: 44 requests in the ERCOT queue, 42 active totaling 8,624.9 MW.

Tracked changes

1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-10-05 Status change n/a SS Completed, FIS Started, No IA → SS Completed, FIS Completed, No IA

Full change log →

Additional filed fields

Interconnecting entityGulfStar Power, LLC
CDR reporting zoneSOUTH
Fuel codeOTH
Technology codeBA
Screening study complete2025-12-23
Full interconnection study approved2026-09-23

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.