Home / ERCOT / substation / Riley Substation (#); AEP
Riley Substation (#); AEP substation interconnection queue
3 active projects
totalling 932 MW in the ERCOT queue.
3 active projects
932 active MW
3 total filed
Queue ID Project kV MW Resource Status
27INR0005
Dundee East A Wind
345
524
Wind
SS Completed, FIS Started, IA
27INR0011
Dundee East B Wind
345
261.5
Wind
SS Completed, FIS Started, IA
27INR0004
Dundee West Wind
345
146.5
Wind
SS Completed, FIS Started, IA
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with ERCOT before relying on these figures.
Site Scanner draws on HIFLD substations and electric retail service
territories, USGS watershed boundaries, FEMA flood hazard layers and US Census
geocoding. Queue data is compiled from public interconnection
queue filings. Every figure carries its source and retrieval date.
A withdrawal records that a request left the queue. It says
nothing about injection capacity at that location. Verify with the relevant ISO before
relying on any figure. Queue datasets are tracked separately and are
not directly comparable: status vocabularies, fuel coding, and publication
cadence all differ.
Screening aid only. Not a system impact study. Contiguous US.