Riley Substation (#); AEP substation interconnection queue

3 active projects totaling 932 MW in the ERCOT queue.

3 ERCOT queue filings name Riley Substation (#); AEP as the point of interconnection, all in TX.

Target commercial operation date as filed: Dec 2027 (3 filings). 3 active filings target a date after November 27, 2026.

Interconnecting entity as filed: Felix 2, LLC (3 filings).

3active projects
932active MW
3total filed
Queue IDProjectkVMWResourceStatusTarget COD
27INR0005 Dundee East A Wind 345 524 Wind SS Completed, FIS Started, IA Dec 2027
27INR0011 Dundee East B Wind 345 261.5 Wind SS Completed, FIS Started, IA Dec 2027
27INR0004 Dundee West Wind 345 146.5 Wind SS Completed, FIS Started, IA Dec 2027

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.

Other ERCOT queue substations in Baylor County, TX

All 7 ERCOT queue filings in Baylor County, TX.

Other ERCOT queue substations in Wilbarger County, TX

All 24 ERCOT queue filings in Wilbarger County, TX.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first