Riley Substation (#); AEP substation interconnection queue
3 active projects totaling 932 MW in the ERCOT queue.
3 ERCOT queue filings name Riley Substation (#); AEP as the point of interconnection, all in TX.
Target commercial operation date as filed: Dec 2027 (3 filings). 3 active filings target a date after November 27, 2026.
Interconnecting entity as filed: Felix 2, LLC (3 filings).
3active projects
932active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| 27INR0005 | Dundee East A Wind | 345 | 524 | Wind | SS Completed, FIS Started, IA | Dec 2027 |
| 27INR0011 | Dundee East B Wind | 345 | 261.5 | Wind | SS Completed, FIS Started, IA | Dec 2027 |
| 27INR0004 | Dundee West Wind | 345 | 146.5 | Wind | SS Completed, FIS Started, IA | Dec 2027 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.
Other ERCOT queue substations in Baylor County, TX
- Tap into FOXTAIL- OKLAUNION: 3 active, 1,003.8 MW of 3 filed
Other ERCOT queue substations in Wilbarger County, TX
- Tap RILEY7A - EDITHCLA7B: 6 active, 3,256.5 MW of 6 filed
- Tap RILEY7A - EDITHCLA7B.: 2 active, 2,476.6 MW of 2 filed
- Riley: 3 active, 1,042.5 MW of 3 filed
- Tap # Tesla Road to # Riley: 2 active, 801.2 MW of 2 filed
- The Riley Substation (#); AEP: 2 active, 285.1 MW of 2 filed
- Tap (#) Tesla - (#) Riley: 2 active, 257.8 MW of 2 filed
- Vernon: 2 active, 75 MW of 2 filed