Substation Scout

Baylor, TX interconnection queue

6 active projects totalling 1,891 MW in the ERCOT queue, plus 1 with terminal status (shown greyed).

6active projects
1,891active MW
7total filed
Queue IDProjectkVMWResourceStatus
27INR0005 Dundee East A Wind 345 524 Wind SS Completed, FIS Started, IA
29INR0198 Velveteen Solar I n/r 502.2 Solar SS Completed, FIS Started, No IA
29INR0225 Velveteen Solar II n/r 300.9 Solar SS Completed, FIS Started, No IA
21INR0432 Diversion Wind n/r 300 Wind Inactive
27INR0011 Dundee East B Wind 345 261.5 Wind SS Completed, FIS Started, IA
29INR0226 Velveteen Solar III n/r 200.7 Solar SS Completed, FIS Started, No IA
28INR0514 Young Road Solar 69 101.7 Solar SS Completed, FIS Started, No IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.