Dundee East B Wind
ERCOT queue ID 27INR0011
Dundee East B Wind (27INR0011) is listed in the ERCOT interconnection queue as a 261.5 MW wind project in Baylor County, TX. The filing names Riley Substation (#); AEP as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, IA”, with a target commercial operation date of December 31, 2027. It records the screening study as complete on April 14, 2023 and the interconnection agreement as signed on February 21, 2025.
| Queue ID | 27INR0011 |
|---|---|
| Project name | Dundee East B Wind |
| Status (as published) | SS Completed, FIS Started, IA |
| Substation | Riley Substation (#); AEP |
| Point of interconnection | 345 kV Riley Substation (#6101); AEP |
| County | Baylor |
| State | TX |
| Voltage | 345 kV |
| Capacity | 261.5 MW |
| Resource (as published) | WIN/WT |
| Resource category | Wind (normalized for filtering) |
| Target commercial operation | 2027-12-31 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Riley Substation (#); AEP substation: 3 requests in the ERCOT queue, 3 active totaling 932 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| 27INR0005 | Dundee East A Wind | 524 | Wind | SS Completed, FIS Started, IA |
| 27INR0004 | Dundee West Wind | 146.5 | Wind | SS Completed, FIS Started, IA |
Baylor, TX: 7 requests in the ERCOT queue, 6 active totaling 1,891 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Felix 2, LLC |
|---|---|
| CDR reporting zone | WEST |
| Fuel code | WIN |
| Technology code | WT |
| Interconnection agreement signed | 2025-02-21 |
| Screening study complete | 2023-04-14 |
| Air permit | Not Required |
| Water availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.