Tap RILEY7A - EDITHCLA7B. substation interconnection queue

2 active projects totalling 2,476.6 MW in the ERCOT queue.

2active projects
2,476.6active MW
2total filed
Queue IDProjectkVMWResourceStatus
27INR0581 Limitless Energy Hub I 345 1,238.3 Gas SS Completed, FIS Started, IA
27INR0582 Limitless Energy Hub II 345 1,238.3 Gas SS Completed, FIS Started, IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.