Riley substation interconnection queue
3 active projects totaling 1,042.5 MW in the ERCOT queue.
3 ERCOT queue filings name Riley as the point of interconnection, all in Wilbarger County, TX.
Target commercial operation dates as filed run from Jun 2028 to Oct 2029 (3 filings). 3 active filings target a date after November 27, 2026.
Interconnecting entity as filed: Oklaunion Power Station, LLC (1 filing), Felix 1, LLC (1 filing), Crescent Solar, LLC (1 filing).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| 22INR0497 | TEXPO | 345 | 680 | Gas | SS Completed, FIS Started, No IA | Oct 2029 |
| 27INR0012 | Felix West Solar | 345 | 185 | Solar | SS Completed, FIS Started, IA | Jun 2028 |
| 22INR0209 | Felix North Solar | 345 | 177.5 | Solar | SS Completed, FIS Started, IA | Jun 2028 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.
Tracked changes at this substation
2 changes to filings at this point of interconnection, observed between weekly snapshots of the ERCOT queue. For a capacity revision MW is the change, not the new total.
| Detected | Queue ID | Change | MW | Status was → now |
|---|---|---|---|---|
| 2026-11-09 | 27INR0012 | Capacity revised | −16 | SS Completed, FIS Started, IA → SS Completed, FIS Started, IA |
| 2026-11-09 | 22INR0209 | Capacity revised | −23.5 | SS Completed, FIS Started, IA → SS Completed, FIS Started, IA |
Same name on other Substation Scout pages
Other sources that print a substation named “Riley” in TX. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each.
- Riley: Expansion Tracker, ERCOT planning (Wilbarger County, TX)
Other ERCOT queue substations in Wilbarger County, TX
- Tap RILEY7A - EDITHCLA7B: 6 active, 3,256.5 MW of 6 filed
- Tap RILEY7A - EDITHCLA7B.: 2 active, 2,476.6 MW of 2 filed
- Riley Substation (#); AEP: 3 active, 932 MW of 3 filed
- Tap # Tesla Road to # Riley: 2 active, 801.2 MW of 2 filed
- The Riley Substation (#); AEP: 2 active, 285.1 MW of 2 filed
- Tap (#) Tesla - (#) Riley: 2 active, 257.8 MW of 2 filed
- Vernon: 2 active, 75 MW of 2 filed