Tap (#) Tesla - (#) Riley substation interconnection queue

2 active projects totalling 257.8 MW in the ERCOT queue.

2active projects
257.8active MW
2total filed
Queue IDProjectkVMWResourceStatus
27INR0333 White Wing Storage 345 130.4 Battery SS Completed, FIS Started, No IA
27INR0332 White Wing Solar 345 127.4 Solar SS Completed, FIS Started, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.