Vernon substation interconnection queue

2 active projects totaling 75 MW in the ERCOT queue.

2 ERCOT queue filings name Vernon as the point of interconnection, all in Wilbarger County, TX.

Target commercial operation date as filed: Feb 2029 (2 filings). 2 active filings target a date after November 27, 2026.

Interconnecting entity as filed: Vernon Solar and Storage LLC (a Delaware LLC) (2 filings).

2active projects
75active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
25INR0377 Proteus Vernon Solar SLF 138 75 Solar SS Completed, FIS Started, No IA Feb 2029
25INR0416 Proteus Vernon Storage SLF 138 0 Battery SS Completed, FIS Started, No IA Feb 2029

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.

Other ERCOT queue substations in Wilbarger County, TX

All 24 ERCOT queue filings in Wilbarger County, TX.

Site Scanner