Tap into FOXTAIL- OKLAUNION substation interconnection queue

3 active projects totaling 1,003.8 MW in the ERCOT queue.

3 ERCOT queue filings name Tap into FOXTAIL- OKLAUNION as the point of interconnection, all in Baylor County, TX.

Target commercial operation dates as filed run from Oct 2029 to Dec 2029 (3 filings). 3 active filings target a date after November 27, 2026.

Interconnecting entity as filed: Velveteen Solar, LLC (1 filing), Velveteen Solar II, LLC (1 filing), Velveteen Solar III, LLC (1 filing).

3active projects
1,003.8active MW
3total filed
Queue IDProjectkVMWResourceStatusTarget COD
29INR0198 Velveteen Solar I n/r 502.2 Solar SS Completed, FIS Started, No IA Oct 2029
29INR0225 Velveteen Solar II n/r 300.9 Solar SS Completed, FIS Started, No IA Dec 2029
29INR0226 Velveteen Solar III n/r 200.7 Solar SS Completed, FIS Started, No IA Dec 2029

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.

Other ERCOT queue substations in Baylor County, TX

All 7 ERCOT queue filings in Baylor County, TX.