Tap into FOXTAIL- OKLAUNION substation interconnection queue
3 active projects totaling 1,003.8 MW in the ERCOT queue.
3 ERCOT queue filings name Tap into FOXTAIL- OKLAUNION as the point of interconnection, all in Baylor County, TX.
Target commercial operation dates as filed run from Oct 2029 to Dec 2029 (3 filings). 3 active filings target a date after November 27, 2026.
Interconnecting entity as filed: Velveteen Solar, LLC (1 filing), Velveteen Solar II, LLC (1 filing), Velveteen Solar III, LLC (1 filing).
3active projects
1,003.8active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| 29INR0198 | Velveteen Solar I | n/r | 502.2 | Solar | SS Completed, FIS Started, No IA | Oct 2029 |
| 29INR0225 | Velveteen Solar II | n/r | 300.9 | Solar | SS Completed, FIS Started, No IA | Dec 2029 |
| 29INR0226 | Velveteen Solar III | n/r | 200.7 | Solar | SS Completed, FIS Started, No IA | Dec 2029 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.
Other ERCOT queue substations in Baylor County, TX
- Riley Substation (#); AEP: 3 active, 932 MW of 3 filed
Site Scanner