The Riley Substation (#); AEP substation interconnection queue

2 active projects totalling 301.4 MW in the ERCOT queue.

2active projects
301.4active MW
2total filed
Queue IDProjectkVMWResourceStatus
27INR0007 Felix East Solar 345 200.9 Solar SS Completed, FIS Started, IA
27INR0009 Felix Storage 345 100.5 Battery SS Completed, FIS Started, No IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.