Lane City Wind
ERCOT queue ID 22INR0517
Lane City Wind (22INR0517) is listed in the ERCOT interconnection queue as a 199.5 MW wind project in Wharton County, TX. The filing names Bailey as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, IA”, with a target commercial operation date of December 31, 2026. It records the screening study as complete on July 28, 2021, the full interconnection study as approved on July 18, 2024 and the interconnection agreement as signed on May 13, 2022.
| Queue ID | 22INR0517 |
|---|---|
| Project name | Lane City Wind |
| Status (as published) | SS Completed, FIS Completed, IA |
| Substation | Bailey |
| Point of interconnection | 44040 Bailey 345kV |
| County | Wharton |
| State | TX |
| Voltage | 345 kV |
| Capacity | 199.5 MW |
| Resource (as published) | WIN/WT |
| Resource category | Wind (normalized for filtering) |
| Target commercial operation | 2026-12-31 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Bailey substation: 3 requests in the ERCOT queue, 3 active totaling 707.8 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| 29INR0082 | Peach Creek Solar | 300 | Solar | SS Completed, FIS Started, No IA |
| 23INR0058 | Erin Solar | 208.3 | Solar | SS Completed, FIS Completed, IA |
Wharton, TX: 44 requests in the ERCOT queue, 42 active totaling 8,624.9 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | RWE Clean Energy, LLC |
|---|---|
| CDR reporting zone | SOUTH |
| Fuel code | WIN |
| Technology code | WT |
| Interconnection agreement signed | 2022-05-13 |
| Screening study complete | 2021-07-28 |
| Full interconnection study approved | 2024-07-18 |
| Air permit | Not Required |
| Water availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.