Peach Creek Solar

ERCOT queue ID 29INR0082

Peach Creek Solar (29INR0082) is listed in the ERCOT interconnection queue as a 300 MW solar project in Wharton County, TX. The filing names Bailey as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of September 30, 2029. It records the screening study as complete on April 8, 2025.

Queue ID29INR0082
Project namePeach Creek Solar
Status (as published)SS Completed, FIS Started, No IA
SubstationBailey
Point of interconnection44040 Bailey 345 kV
CountyWharton
StateTX
Voltage345 kV
Capacity300 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2029-09-30
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Bailey substation: 3 requests in the ERCOT queue, 3 active totaling 707.8 MW.

Queue IDProjectMWResourceStatus
23INR0058Erin Solar208.3SolarSS Completed, FIS Completed, IA
22INR0517Lane City Wind199.5WindSS Completed, FIS Completed, IA

Wharton, TX: 44 requests in the ERCOT queue, 42 active totaling 8,624.9 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityAEUG Peach Creek Solar LLC
CDR reporting zoneSOUTH
Fuel codeSOL
Technology codePV
Screening study complete2025-04-08
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.