Erin Solar

ERCOT queue ID 23INR0058

Erin Solar (23INR0058) is listed in the ERCOT interconnection queue as a 208.3 MW solar project in Wharton County, TX. The filing names Bailey as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, IA”, with a target commercial operation date of December 31, 2029. It records the screening study as complete on October 8, 2020, the full interconnection study as approved on October 1, 2026 and the interconnection agreement as signed on March 22, 2023.

Queue ID23INR0058
Project nameErin Solar
Status (as published)SS Completed, FIS Completed, IA
SubstationBailey
Point of interconnection44040 Bailey 345 kV
CountyWharton
StateTX
Voltage345 kV
Capacity208.3 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2029-12-31
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Bailey substation: 3 requests in the ERCOT queue, 3 active totaling 707.8 MW.

Queue IDProjectMWResourceStatus
29INR0082Peach Creek Solar300SolarSS Completed, FIS Started, No IA
22INR0517Lane City Wind199.5WindSS Completed, FIS Completed, IA

Wharton, TX: 44 requests in the ERCOT queue, 42 active totaling 8,624.9 MW.

Tracked changes

1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-11-09 Status change n/a SS Completed, FIS Started, IA → SS Completed, FIS Completed, IA

Full change log →

Additional filed fields

Interconnecting entityErin Solar LLC
CDR reporting zoneSOUTH
Fuel codeSOL
Technology codePV
Interconnection agreement signed2023-03-22
Screening study complete2020-10-08
Full interconnection study approved2026-10-01
Air permitNot Required
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.