Occoquan substation interconnection queue

2 active projects totalling 20.9 MW in the PJM queue, plus 3 with terminal status (shown greyed).

2active projects
20.9active MW
5total filed
Queue IDProjectkVMWResourceStatus
S50 Ogden Martin 230 18 Other In Service
C01-1745 Occoquan 230 kV 230 8.1 Other Withdrawn
AH1-197 Occoquan 230kV 230 7.1 Other Withdrawn
W3-002 I-95 Landfill Phase 2 34.5 2.9 Gas In Service
X3-055 Occoquan 34.5kV 34.5 0 Other Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.