Substation Scout

Fostoria Central substation interconnection queue

2 active projects totalling 82 MW in the PJM queue, plus 3 with terminal status (shown greyed).

2active projects
82active MW
5total filed
Queue IDProjectkVMWResourceStatus
AG2-375 Fostoria Central 345 kV 345 500 Battery Withdrawn
AG1-076 South Branch Solar 138 46 Solar Suspended
AD1-070 South Branch Solar 138 36 Solar Suspended
AI2-407 Fostoria Central 138 kV 138 31.2 Solar Withdrawn
V4-015 Fostoria Central 138kV 138 8.6 Wind Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.