Montross Solar Facility

PJM queue ID AC1-118

Montross Solar Facility (AC1-118) is listed in the PJM interconnection queue as a 13.2 MW solar project in Westmoreland County, VA. The filing names Westmoreland as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of February 15, 2019.

Queue IDAC1-118
Project nameMontross Solar Facility
Status (as published)In Service
SubstationWestmoreland
Point of interconnectionWestmoreland 34.5kV
CountyWestmoreland
StateVA
Voltage34.5 kV
Capacity13.2 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2019-02-15
Source datasetserial

Same substation and county

Westmoreland substation: 5 requests in the PJM queue, 1 active totaling 13.2 MW.

Queue IDProjectMWResourceStatus
AI1-093Westmoreland 34.5 kV24BatteryWithdrawn
AI1-094Westmoreland 34.5 kV24BatteryWithdrawn
AB1-026Montross Solar14SolarWithdrawn
AA1-112Westmoreland Landfill Project4GasWithdrawn

Westmoreland, VA: 20 requests in the PJM queue, 8 active totaling 264.5 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy20
MW capacity13.2
MFO20

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.