Montross Solar Facility
PJM queue ID AC1-118
Montross Solar Facility (AC1-118) is listed in the PJM interconnection queue as a 13.2 MW solar project in Westmoreland County, VA. The filing names Westmoreland as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of February 15, 2019.
| Queue ID | AC1-118 |
|---|---|
| Project name | Montross Solar Facility |
| Status (as published) | In Service |
| Substation | Westmoreland |
| Point of interconnection | Westmoreland 34.5kV |
| County | Westmoreland |
| State | VA |
| Voltage | 34.5 kV |
| Capacity | 13.2 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2019-02-15 |
| Source dataset | serial |
Same substation and county
Westmoreland substation: 5 requests in the PJM queue, 1 active totaling 13.2 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AI1-093 | Westmoreland 34.5 kV | 24 | Battery | Withdrawn |
| AI1-094 | Westmoreland 34.5 kV | 24 | Battery | Withdrawn |
| AB1-026 | Montross Solar | 14 | Solar | Withdrawn |
| AA1-112 | Westmoreland Landfill Project | 4 | Gas | Withdrawn |
Westmoreland, VA: 20 requests in the PJM queue, 8 active totaling 264.5 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 20 |
| MW capacity | 13.2 |
| MFO | 20 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.