Rochelle Solar

PJM queue ID AD1-013

Rochelle Solar (AD1-013) is listed in the PJM interconnection queue as a 15.4 MW solar project in Ogle County, IL. The filing names Twombly Road as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of May 27, 2028.

Queue IDAD1-013
Project nameRochelle Solar
Status (as published)Engineering and Procurement
SubstationTwombly Road
Point of interconnectionTwombly Road 138kV
CountyOgle
StateIL
Voltage138 kV
Capacity15.4 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2028-05-27
Source datasetserial

Same substation and county

Twombly Road substation: 2 requests in the PJM queue, 1 active totaling 15.4 MW.

Queue IDProjectMWResourceStatus
AE1-199Twombly Road 138 kV20SolarWithdrawn

Ogle, IL: 40 requests in the PJM queue, 15 active totaling 1,727 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy40
MW capacity15.4
MFO40

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.