Rochelle Solar
PJM queue ID AF1-331
Rochelle Solar (AF1-331) is listed in the PJM interconnection queue as a 20 MW solar project in Ogle County, IL. The filing names Twombley Road as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of May 27, 2028.
| Queue ID | AF1-331 |
|---|---|
| Project name | Rochelle Solar |
| Status (as published) | Engineering and Procurement |
| Substation | Twombley Road |
| Point of interconnection | Twombley Road |
| County | Ogle |
| State | IL |
| Voltage | Not reported |
| Capacity | 20 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2028-05-27 |
| Source dataset | serial |
Same substation and county
Twombley Road substation: 2 requests in the PJM queue, 1 active totaling 20 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AE1-076 | Twombley Road 138 kV | 20 | Solar | Withdrawn |
Ogle, IL: 40 requests in the PJM queue, 15 active totaling 1,727 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 20 |
| MW capacity | 20 |
| MFO | 60 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.