Timber Road II WF
PJM queue ID AF2-376
Timber Road II WF (AF2-376) is listed in the PJM interconnection queue as a 20 MW battery project in Paulding County, OH. The filing names Timber Switch as its point of interconnection. PJM lists its status as “EP”, with a target commercial operation date of December 31, 2029.
| Queue ID | AF2-376 |
|---|---|
| Project name | Timber Road II WF |
| Status (as published) | EP |
| Substation | Timber Switch |
| Point of interconnection | Timber Switch 138 kV |
| County | Paulding |
| State | OH |
| Voltage | 138 kV |
| Capacity | 20 MW |
| Resource (as published) | Storage |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2029-12-31 |
| Source dataset | cycle |
Same substation and county
Timber Switch substation: 3 requests in the PJM queue, 1 active totaling 20 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AH1-522 | Timber Switch 138 kV | 28.2 | Solar | Withdrawn |
| AC1-176 | Timber Switch 138kV | 7.6 | Wind | Withdrawn |
Paulding, OH: 28 requests in the PJM queue, 12 active totaling 250.2 MW.
A substation with the same name is named in PJM transmission planning materials: Timber Switch (AEP, 2 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Paulding Wind Farm II LLC |
|---|---|
| Transmission owner | AEP |
| Project type | Generation Interconnection |
| Cycle | TC1 |
| Stage | FINAL AGREEMENT |
| MW energy | 50.0 |
| MW capacity | 20.0 |
| MFO | 147.0 |
| Submitted date | 3/31/2020 |
| Last updated | 4/29/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.