Bear Island Solar
PJM queue ID AF2-304
Bear Island Solar (AF2-304) is listed in the PJM interconnection queue as a 89 MW hybrid project in Surry County, VA. The filing names Surry-Hopewell as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of September 1, 2028.
| Queue ID | AF2-304 |
|---|---|
| Project name | Bear Island Solar |
| Status (as published) | Engineering and Procurement |
| Substation | Surry-Hopewell |
| Point of interconnection | Surry-Hopewell 230 kV |
| County | Surry |
| State | VA |
| Voltage | 230 kV |
| Capacity | 89 MW |
| Resource (as published) | Solar; Storage |
| Resource category | Hybrid (normalized for filtering) |
| Target commercial operation | 2028-09-01 |
| Source dataset | serial |
Same substation and county
Surry-Hopewell substation: 2 requests in the PJM queue, 1 active totaling 89 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AF2-065 | Surry-Hopewell 230 kV | 76.5 | Solar | Withdrawn |
Surry, VA: 43 requests in the PJM queue, 16 active totaling 1,016.5 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 89 |
| MW capacity | 89 |
| MFO | 89 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.