Bear Island Solar (AF2-304) is listed in the PJM interconnection queue as a 89 MW hybrid project in Surry County, VA. The filing names Surry-Hopewell as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of September 1, 2028.

Queue IDAF2-304
Project nameBear Island Solar
Status (as published)Engineering and Procurement
SubstationSurry-Hopewell
Point of interconnectionSurry-Hopewell 230 kV
CountySurry
StateVA
Voltage230 kV
Capacity89 MW
Resource (as published)Solar; Storage
Resource categoryHybrid (normalized for filtering)
Target commercial operation2028-09-01
Source datasetserial

Same substation and county

Surry-Hopewell substation: 2 requests in the PJM queue, 1 active totaling 89 MW.

Queue IDProjectMWResourceStatus
AF2-065Surry-Hopewell 230 kV76.5SolarWithdrawn

Surry, VA: 43 requests in the PJM queue, 16 active totaling 1,016.5 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy89
MW capacity89
MFO89

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first