4 active projects totalling 124.8 MW in the PJM queue, plus 11 with terminal status (shown greyed).

4active projects
124.8active MW
15total filed
Queue IDProjectkVMWResourceStatus
AG2-359 Hillcrest 345 kV 345 125 Battery Withdrawn
AH1-273 Brown - Eastwood 138 kV 138 96 Solar Withdrawn
AC2-062 Emerald-Kenton 138kV 138 55 Solar Withdrawn
AB1-014 Hillcrest Solar Facility 138 47.5 Solar In Service
AE1-120 Hillcrest Solar I 138 44 Solar In Service
AC1-022 N. Vienna 138kV 138 42 Solar Withdrawn
AC2-066 Hillcrest Solar Facility 138 28.5 Solar In Service
Z2-029 Stuart Electric Generating Station n/r 20.5 Coal Deactivated
AH1-113 North Pole - Russelville 34.5 kV 34.5 12 Solar Withdrawn
AH1-114 North Pole - Russelville 34.5 kV 34.5 12 Solar Withdrawn
AA1-125 Seaman 138kV 138 7.6 Solar Withdrawn
AA1-126 Hillcrest 138kV 138 7.6 Solar Withdrawn
W3-098 Hillsboro-Kenton (KU) 138kV 138 7.6 Solar Withdrawn
AA2-100 Bio Energy Landfill Facility 34.5 4.8 Gas In Service
W3-097 Russelville OH n/r 1.9 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.