Hillcrest substation interconnection queue

3 active projects totaling 120 MW in the PJM queue, plus 3 with terminal status (shown grayed).

6 PJM queue filings name Hillcrest as the point of interconnection, all in OH.

Target commercial operation dates as filed run from Oct 2016 to Nov 2024 (6 filings).

3active projects
120active MW
6total filed
Queue IDProjectkVMWResourceStatusTarget COD
AG2-359 Hillcrest 345 kV 345 125 Battery Withdrawn Nov 2024
AB1-014 Hillcrest Solar Facility 138 47.5 Solar In Service Dec 2020
AE1-120 Hillcrest Solar I 138 44 Solar In Service Dec 2020
AD2-151 Hillcrest 345kV 345 42 Solar Withdrawn Dec 2020
AC2-066 Hillcrest Solar Facility 138 28.5 Solar In Service Dec 2020
AA1-126 Hillcrest 138kV 138 7.6 Solar Withdrawn Oct 2016

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Same name on other Substation Scout pages

Other sources that print a substation named “Hillcrest” in OH. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each. Where a PJM planning record prints no state, the match is by name within the states the utility zone serves, which is weaker.

Other PJM queue substations in Brown County, OH

All 15 PJM queue filings in Brown County, OH.

Other PJM queue substations in Muskingum County, OH

All 17 PJM queue filings in Muskingum County, OH.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first