Hillcrest substation interconnection queue

3 active projects totalling 120 MW in the PJM queue, plus 3 with terminal status (shown greyed).

3active projects
120active MW
6total filed
Queue IDProjectkVMWResourceStatus
AG2-359 Hillcrest 345 kV 345 125 Battery Withdrawn
AB1-014 Hillcrest Solar Facility 138 47.5 Solar In Service
AE1-120 Hillcrest Solar I 138 44 Solar In Service
AD2-151 Hillcrest 345kV 345 42 Solar Withdrawn
AC2-066 Hillcrest Solar Facility 138 28.5 Solar In Service
AA1-126 Hillcrest 138kV 138 7.6 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.