North Pole - Russelville substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name North Pole - Russelville as the point of interconnection, all in Brown County, OH.
Target commercial operation date as filed: Jul 2023 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AH1-113 | North Pole - Russelville 34.5 kV | 34.5 | 12 | Solar | Withdrawn | Jul 2023 |
| AH1-114 | North Pole - Russelville 34.5 kV | 34.5 | 12 | Solar | Withdrawn | Jul 2023 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.