Montour 230 kV
PJM queue ID C01-1176
Montour 230 kV (C01-1176) is listed in the PJM interconnection queue as a 574 MW gas project in Montour County, PA. The filing names Montour as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of January 1, 2031.
| Queue ID | C01-1176 |
|---|---|
| Project name | Montour 230 kV |
| Status (as published) | Active |
| Substation | Montour |
| Point of interconnection | Montour 230 kV |
| County | Montour |
| State | PA |
| Voltage | 230 kV |
| Capacity | 574 MW |
| Resource (as published) | Natural Gas |
| Resource category | Gas (normalized for filtering) |
| Target commercial operation | 2031-01-01 |
| Source dataset | cycle |
Same substation and county
Montour substation: 14 requests in the PJM queue, 2 active totaling 581 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| E07 | Montour #2 | 7 | Coal | In Service |
| AE2-271 | Montour Solar One | 61 | Solar | Withdrawn |
| AE1-224 | Montour 230 kV | 60 | Solar | Withdrawn |
| AF1-311 | Montour 230 kV | 57 | Solar | Withdrawn |
| AI2-475 | Montour 230 kV | 40.6 | Solar | Withdrawn |
| AI2-474 | Montour 230 kV | 34.8 | Solar | Withdrawn |
| AF2-331 | Montour 230 kV | 30 | Solar | Withdrawn |
| AF2-332 | Montour 230 kV | 30 | Solar | Withdrawn |
| AI2-471 | Montour 230 kV | 29.5 | Solar | Withdrawn |
| AI2-473 | Montour 230 kV | 29 | Solar | Withdrawn |
| AI2-472 | Montour 230 kV | 14.5 | Solar | Withdrawn |
| AF2-333 | Montour 230 kV | 12 | Solar | Withdrawn |
1 more on the substation page.
Montour, PA: 23 requests in the PJM queue, 5 active totaling 611 MW.
A substation with the same name is named in PJM transmission planning materials: Montour (PPL, 4 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Montour, LLC |
|---|---|
| Transmission owner | PPL |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 640.0 |
| MW capacity | 574.0 |
| MFO | 640.0 |
| Submitted date | 4/24/2026 |
| Last updated | 6/10/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.