Montour #2

PJM queue ID E07

Montour #2 (E07) is listed in the PJM interconnection queue as a 7 MW coal project in Montour County, PA. The filing names Montour as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of January 1, 1999.

Queue IDE07
Project nameMontour #2
Status (as published)In Service
SubstationMontour
Point of interconnectionMontour 230kV
CountyMontour
StatePA
Voltage230 kV
Capacity7 MW
Resource (as published)Coal
Resource categoryCoal (normalized for filtering)
Target commercial operation1999-01-01
Source datasetserial

Same substation and county

Montour substation: 14 requests in the PJM queue, 2 active totaling 581 MW.

Queue IDProjectMWResourceStatus
C01-1176Montour 230 kV574GasActive
AE2-271Montour Solar One61SolarWithdrawn
AE1-224Montour 230 kV60SolarWithdrawn
AF1-311Montour 230 kV57SolarWithdrawn
AI2-475Montour 230 kV40.6SolarWithdrawn
AI2-474Montour 230 kV34.8SolarWithdrawn
AF2-331Montour 230 kV30SolarWithdrawn
AF2-332Montour 230 kV30SolarWithdrawn
AI2-471Montour 230 kV29.5SolarWithdrawn
AI2-473Montour 230 kV29SolarWithdrawn
AI2-472Montour 230 kV14.5SolarWithdrawn
AF2-333Montour 230 kV12SolarWithdrawn

1 more on the substation page.

Montour, PA: 23 requests in the PJM queue, 5 active totaling 611 MW.

A substation with the same name is named in PJM transmission planning materials: Montour (PPL, 4 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy7
MW capacity7
MFO766

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first