Golden Aster Solar Energy Center

PJM queue ID AE2-172

Golden Aster Solar Energy Center (AE2-172) is listed in the PJM interconnection queue as a 40 MW battery project in Grant County, IN. The filing names Mississinewa-Gaston as its point of interconnection. PJM lists its status as “Suspended”, with a target commercial operation date of May 31, 2026.

Queue IDAE2-172
Project nameGolden Aster Solar Energy Center
Status (as published)Suspended
SubstationMississinewa-Gaston
Point of interconnectionMississinewa-Gaston 138 kV
CountyGrant
StateIN
Voltage138 kV
Capacity40 MW
Resource (as published)Storage
Resource categoryBattery (normalized for filtering)
Target commercial operation2026-05-31
Source datasetserial

Same substation and county

Mississinewa-Gaston substation: 3 requests in the PJM queue, 3 active totaling 136 MW.

Queue IDProjectMWResourceStatus
AE1-207Golden Aster Solar Energy Center67.2SolarSuspended
AH1-306Mississinewa-Gaston 138 kV28.8SolarActive

Grant, IN: 15 requests in the PJM queue, 9 active totaling 497.3 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy40
MW capacity40
MFO200

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.