Mississinewa-Gaston 138 kV (AH1-306) is listed in the PJM interconnection queue as a 28.8 MW solar project in Grant County, IN. The filing names Mississinewa-Gaston as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of December 31, 2030.
| Queue ID | AH1-306 |
|---|---|
| Project name | Mississinewa-Gaston 138 kV |
| Status (as published) | Active |
| Substation | Mississinewa-Gaston |
| Point of interconnection | Mississinewa-Gaston 138 kV |
| County | Grant |
| State | IN |
| Voltage | 138 kV |
| Capacity | 28.8 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2030-12-31 |
| Source dataset | cycle |
Same substation and county
Mississinewa-Gaston substation: 3 requests in the PJM queue, 3 active totaling 136 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AE1-207 | Golden Aster Solar Energy Center | 67.2 | Solar | Suspended |
| AE2-172 | Golden Aster Solar Energy Center | 40 | Battery | Suspended |
Grant, IN: 15 requests in the PJM queue, 9 active totaling 497.3 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Golden Aster Solar Energy LLC |
|---|---|
| Transmission owner | AEP |
| Project type | Generation Interconnection |
| Cycle | TC2 |
| Stage | Phase 3 |
| MW energy | 0.0 |
| MW capacity | 28.8 |
| MFO | 200.0 |
| Submitted date | 9/11/2021 |
| Last updated | 8/27/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.