Substation Scout

Golden Aster Solar Energy Center

PJM queue ID AE1-207

Golden Aster Solar Energy Center (AE1-207) is listed in the PJM interconnection queue as a 67.2 MW solar project in Grant County, IN. The filing names Mississinewa-Gaston as its point of interconnection. PJM lists its status as “Suspended”, with a target commercial operation date of May 31, 2026.

Queue IDAE1-207
Project nameGolden Aster Solar Energy Center
Status (as published)Suspended
SubstationMississinewa-Gaston
Point of interconnectionMississinewa-Gaston 138 kV
CountyGrant
StateIN
Voltage138 kV
Capacity67.2 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2026-05-31
Source datasetserial

Same substation and county

Mississinewa-Gaston substation: 3 requests in the PJM queue, 3 active totaling 136 MW.

Queue IDProjectMWResourceStatus
AE2-172Golden Aster Solar Energy Center40BatterySuspended
AH1-306Mississinewa-Gaston 138 kV28.8SolarActive

Grant, IN: 15 requests in the PJM queue, 9 active totaling 497.3 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy160
MW capacity67.2
MFO160

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first