Losantville 345 kV
PJM queue ID AG2-401
Losantville 345 kV (AG2-401) is listed in the PJM interconnection queue as a 44 MW solar project in Randolph County, IN. The filing names Losantville as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of March 19, 2027.
| Queue ID | AG2-401 |
|---|---|
| Project name | Losantville 345 kV |
| Status (as published) | Active |
| Substation | Losantville |
| Point of interconnection | Losantville 345 kV |
| County | Randolph |
| State | IN |
| Voltage | 345 kV |
| Capacity | 44 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2027-03-19 |
| Source dataset | cycle |
Same substation and county
Losantville substation: 9 requests in the PJM queue, 6 active totaling 410.5 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| C01-1386 | Losantville 345 kV | 200 | Battery | Active |
| AE2-220 | Riverstart Solar Park II | 52.5 | Solar | Engineering and Procurement |
| AC1-174 | Riverstart Solar Park | 38 | Solar | In Service |
| AC1-175 | Riverstart Solar Park | 38 | Solar | In Service |
| AC2-090 | Riverstart Solar Park III | 38 | Solar | In Service |
| AI2-120 | Losantville 345 kV | 52.5 | Solar | Withdrawn |
| AI2-119 | Losantville 345 kV | 48 | Solar | Withdrawn |
| AI2-110 | Losantville 345 kV | 46 | Solar | Withdrawn |
Randolph, IN: 43 requests in the PJM queue, 17 active totaling 939 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Riverstart Solar Park LLC |
|---|---|
| Transmission owner | AEP |
| Project type | Generation Interconnection |
| Cycle | TC2 |
| Stage | Phase 3 |
| MW energy | 0.0 |
| MW capacity | 44.0 |
| MFO | 200.0 |
| Submitted date | 3/30/2021 |
| Last updated | 9/9/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.