Lakehurst 34.5 kV
PJM queue ID C01-1981
Lakehurst 34.5 kV (C01-1981) is listed in the PJM interconnection queue as a 3 MW gas project in Ocean County, NJ. The filing names Lakehurst as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of December 31, 2026.
| Queue ID | C01-1981 |
|---|---|
| Project name | Lakehurst 34.5 kV |
| Status (as published) | Active |
| Substation | Lakehurst |
| Point of interconnection | Lakehurst 34.5 kV |
| County | Ocean |
| State | NJ |
| Voltage | 34.5 kV |
| Capacity | 3 MW |
| Resource (as published) | Natural Gas |
| Resource category | Gas (normalized for filtering) |
| Target commercial operation | 2026-12-31 |
| Source dataset | cycle |
Same substation and county
Lakehurst substation: 3 requests in the PJM queue, 1 active totaling 3 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| E23 | Lakehurst 34.5kV | 50 | Gas | Withdrawn |
| O20 | Ocean Energy LF | 9.4 | Gas | Deactivated |
Ocean, NJ: 55 requests in the PJM queue, 15 active totaling 653.1 MW.
A substation with the same name is named in PJM transmission planning materials: Lakehurst (JCPL, 5 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Ocean Energy Holdings, LLC |
|---|---|
| Transmission owner | JCPL |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 5.3 |
| MW capacity | 3.02 |
| MFO | 5.3 |
| Submitted date | 4/27/2026 |
| Last updated | 6/9/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.