Chatfield substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 4 with terminal status (shown greyed).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
AH2-164 Chatfield 69 kV 69 50 Solar Withdrawn
AF1-230 Chatfield 138 kV 138 29.4 Solar Withdrawn
V3-029 Chatfield 138kV 138 19.5 Wind Withdrawn
AD1-036 Chatfield 138 kV 138 13.3 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.