Chatfield substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 4 with terminal status (shown greyed).
0active projects
0active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AH2-164 | Chatfield 69 kV | 69 | 50 | Solar | Withdrawn |
| AF1-230 | Chatfield 138 kV | 138 | 29.4 | Solar | Withdrawn |
| V3-029 | Chatfield 138kV | 138 | 19.5 | Wind | Withdrawn |
| AD1-036 | Chatfield 138 kV | 138 | 13.3 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.