Bucyrus Center substation interconnection queue
1 active project totaling 150 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name Bucyrus Center as the point of interconnection, all in Crawford County, OH.
Target commercial operation dates as filed run from Dec 2016 to Dec 2030 (2 filings). 1 active filing targets a date after November 27, 2026.
Transmission owner as filed: AEP (1 filing).
1active projects
150active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| C01-1352 | Bucyrus Center 138 kV | 138 | 150 | Battery | Active | Dec 2030 |
| V2-001 | 54 1.8 WT | 138 | 11.3 | Wind | Withdrawn | Dec 2016 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Crawford County, OH
- Galion-South Berwick: 1 active, 72 MW of 2 filed
- Chatfield-Howard: 1 active, 53.6 MW of 2 filed
- Chatfield: none active of 4 filed