Substation Scout

Bucyrus Center substation interconnection queue

1 active project totalling 150 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
150active MW
2total filed
Queue IDProjectkVMWResourceStatus
C01-1352 Bucyrus Center 138 kV 138 150 Battery Active
V2-001 54 1.8 WT 138 11.3 Wind Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.