Chatfield-Howard substation interconnection queue
1 active project totaling 53.6 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name Chatfield-Howard as the point of interconnection, all in Crawford County, OH.
Target commercial operation dates as filed run from Sep 2025 to Dec 2025 (2 filings).
1active projects
53.6active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AC2-015 | Sycamore Creek Solar | 138 | 53.6 | Solar | Partially in Service - Under Construction | Dec 2025 |
| AI2-253 | Chatfield-Howard 138kV | 138 | 20 | Solar | Withdrawn | Sep 2025 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Crawford County, OH
- Bucyrus Center: 1 active, 150 MW of 2 filed
- Galion-South Berwick: 1 active, 72 MW of 2 filed
- Chatfield: none active of 4 filed