Tymochtee Solar (AF1-229) is listed in the PJM interconnection queue as a 72 MW solar project in Wyandot County, OH. The filing names Galion-South Berwick as its point of interconnection. PJM lists its status as “Under Construction”, with a target commercial operation date of August 31, 2027.

Queue IDAF1-229
Project nameTymochtee Solar
Status (as published)Under Construction
SubstationGalion-South Berwick
Point of interconnectionGalion-South Berwick 345 kV
CountyWyandot
StateOH
Voltage345 kV
Capacity72 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2027-08-31
Source datasetserial

Same substation and county

Galion-South Berwick substation: 2 requests in the PJM queue, 1 active totaling 72 MW.

Queue IDProjectMWResourceStatus
AG2-149Galion-South Berwick 345 kV52SolarWithdrawn

Wyandot, OH: 8 requests in the PJM queue, 1 active totaling 72 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy120
MW capacity72
MFO120

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first