Tymochtee Solar
PJM queue ID AF1-229
Tymochtee Solar (AF1-229) is listed in the PJM interconnection queue as a 72 MW solar project in Wyandot County, OH. The filing names Galion-South Berwick as its point of interconnection. PJM lists its status as “Under Construction”, with a target commercial operation date of August 31, 2027.
| Queue ID | AF1-229 |
|---|---|
| Project name | Tymochtee Solar |
| Status (as published) | Under Construction |
| Substation | Galion-South Berwick |
| Point of interconnection | Galion-South Berwick 345 kV |
| County | Wyandot |
| State | OH |
| Voltage | 345 kV |
| Capacity | 72 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2027-08-31 |
| Source dataset | serial |
Same substation and county
Galion-South Berwick substation: 2 requests in the PJM queue, 1 active totaling 72 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AG2-149 | Galion-South Berwick 345 kV | 52 | Solar | Withdrawn |
Wyandot, OH: 8 requests in the PJM queue, 1 active totaling 72 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 120 |
| MW capacity | 72 |
| MFO | 120 |