2 active projects totalling 203.6 MW in the PJM queue, plus 16 with terminal status (shown greyed).

2active projects
203.6active MW
18total filed
Queue IDProjectkVMWResourceStatus
AH1-604 Not reported n/r 150 Battery Withdrawn
C01-1352 Bucyrus Center 138 kV 138 150 Battery Active
AH1-603 Not reported n/r 129.1 Solar Withdrawn
AC2-015 Sycamore Creek Solar 138 53.6 Solar Partially in Service - Under Construction
AG2-149 Galion-South Berwick 345 kV 345 52 Solar Withdrawn
AH2-164 Chatfield 69 kV 69 50 Solar Withdrawn
W3-014 Galion-Fostoria Central 345kV 345 39 Wind Withdrawn
AG1-358 Howard-Melmore 138 kV 138 34.8 Solar Withdrawn
V1-010 Howard-Fostoria Central 138kV 138 33.8 Wind Withdrawn
AG2-564 Sulphur Springs 138 kV 138 32.9 Solar Withdrawn
AF1-230 Chatfield 138 kV 138 29.4 Solar Withdrawn
W3-085 Chatfield-South Tiffin 138kV 138 24 Wind Withdrawn
AI2-253 Chatfield-Howard 138kV 138 20 Solar Withdrawn
V2-020 Howard-West End Fostoria 138kV 138 19.5 Wind Withdrawn
V3-029 Chatfield 138kV 138 19.5 Wind Withdrawn
AG2-296 South Berwick - Galion 345 kV 345 19.4 Solar Withdrawn
AD1-036 Chatfield 138 kV 138 13.3 Solar Withdrawn
V2-001 54 1.8 WT 138 11.3 Wind Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.