Honeysuckle Solar Project

PJM queue ID AF1-158

Honeysuckle Solar Project (AF1-158) is listed in the PJM interconnection queue as a 90 MW solar project in St. Joseph County, IN. The filing names Edison-Gravel Pit as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of January 31, 2025.

Queue IDAF1-158
Project nameHoneysuckle Solar Project
Status (as published)In Service
SubstationEdison-Gravel Pit
Point of interconnectionEdison-Gravel Pit 138 kV
CountySt. Joseph
StateIN
Voltage138 kV
Capacity90 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2025-01-31
Source datasetserial

Same substation and county

Edison-Gravel Pit substation: 2 requests in the PJM queue, 1 active totaling 90 MW.

Queue IDProjectMWResourceStatus
AI2-291Edison-Gravel Pit 138 kV10.5SolarWithdrawn

St. Joseph, IN: 33 requests in the PJM queue, 11 active totaling 1,388.3 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy150
MW capacity90
MFO150

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.