Calumet BESS
PJM queue ID AF2-031
Calumet BESS (AF2-031) is listed in the PJM interconnection queue as a 8 MW battery project in Cook County, IL. The filing names Calumet as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of December 31, 2028.
| Queue ID | AF2-031 |
|---|---|
| Project name | Calumet BESS |
| Status (as published) | Engineering and Procurement |
| Substation | Calumet |
| Point of interconnection | Calumet |
| County | Cook |
| State | IL |
| Voltage | Not reported |
| Capacity | 8 MW |
| Resource (as published) | Storage |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2028-12-31 |
| Source dataset | serial |
Same substation and county
Calumet substation: 4 requests in the PJM queue, 3 active totaling 400 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| C01-2138 | Calumet 138 kV | 365 | Battery | Active |
| U1-054 | River Energy Center | 27 | Gas | In Service |
| AG1-507 | Southeast Chicago Energy Project (aka SCEP) | 296 | Gas | Withdrawn |
Cook, IL: 45 requests in the PJM queue, 9 active totaling 1,488.4 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 20 |
| MW capacity | 8 |
| MFO | 20 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.