Riverstone Solar

PJM queue ID AE1-108

Riverstone Solar (AE1-108) is listed in the PJM interconnection queue as a 89.7 MW solar project in Buckingham County, VA. The filing names Bremo-Scottsville as its point of interconnection. PJM lists its status as “Under Construction”, with a target commercial operation date of November 30, 2027.

Queue IDAE1-108
Project nameRiverstone Solar
Status (as published)Under Construction
SubstationBremo-Scottsville
Point of interconnectionBremo-Scottsville 138 kV
CountyBuckingham
StateVA
Voltage138 kV
Capacity89.7 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2027-11-30
Source datasetserial

Same substation and county

Bremo-Scottsville substation: 2 requests in the PJM queue, 1 active totaling 89.7 MW.

Queue IDProjectMWResourceStatus
AG1-426Bremo-Scottsville 138 kV17BatteryWithdrawn

Buckingham, VA: 27 requests in the PJM queue, 7 active totaling 925.5 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy149.5
MW capacity89.7
MFO149.5

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.