Mercer, OH interconnection queue
1 active project totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).
1active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| W2-068 | Bluff Point 138kV | 138 | 19.5 | Wind | Withdrawn |
| T48 | Coldwater-Rossburg 69kV | 69 | 8 | Wind | Withdrawn |
| S59 | Wenning Poultry | 12 | 0 | Other | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.