Bluff Point
PJM queue ID S71
Bluff Point (S71) is listed in the PJM interconnection queue as a 24 MW wind project in Jay County, IN. PJM lists its status as “In Service”, with a target commercial operation date of December 31, 2017.
| Queue ID | S71 |
|---|---|
| Project name | Bluff Point |
| Status (as published) | In Service |
| Substation | Bluff Point |
| Point of interconnection | Bluff Point 138kV |
| County | Jay |
| State | IN |
| Voltage | 138 kV |
| Capacity | 24 MW |
| Resource (as published) | Wind |
| Resource category | Wind (normalized for filtering) |
| Target commercial operation | 2017-12-31 |
| Source dataset | serial |
Same substation and county
Bluff Point substation: 7 requests in the PJM queue, 3 active totaling 147.2 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| C01-1755 | Bluff Point 138 kV | 120 | Battery | Active |
| Y3-024 | Wabash Valley Power Association, Inc. | 3.2 | Gas | In Service |
| AH2-227 | Bluff Point 138 kV | 75 | Battery | Withdrawn |
| AH2-223 | Bluff Point 138 kV | 30 | Solar | Withdrawn |
| W2-068 | Bluff Point 138kV | 19.5 | Wind | Withdrawn |
| AA2-106 | Bluff Point 69kV | 0 | Battery | Withdrawn |
Jay, IN: 30 requests in the PJM queue, 10 active totaling 477.4 MW.
A substation with the same name is named in PJM transmission planning materials: Bluff Point (AEP, 1 mention).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 120 |
| MW capacity | 24 |
| MFO | 120 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.