Bluff Point 138 kV

PJM queue ID C01-1755

Bluff Point 138 kV (C01-1755) is listed in the PJM interconnection queue as a 120 MW battery project in Jay County, IN. The filing names Bluff Point as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of December 31, 2030.

Queue IDC01-1755
Project nameBluff Point 138 kV
Status (as published)Active
SubstationBluff Point
Point of interconnectionBluff Point 138 kV
CountyJay
StateIN
Voltage138 kV
Capacity120 MW
Resource (as published)Storage
Resource categoryBattery (normalized for filtering)
Target commercial operation2030-12-31
Source datasetcycle

Same substation and county

Bluff Point substation: 7 requests in the PJM queue, 3 active totaling 147.2 MW.

Queue IDProjectMWResourceStatus
S71Bluff Point24WindIn Service
Y3-024Wabash Valley Power Association, Inc.3.2GasIn Service
AH2-227Bluff Point 138 kV75BatteryWithdrawn
AH2-223Bluff Point 138 kV30SolarWithdrawn
W2-068Bluff Point 138kV19.5WindWithdrawn
AA2-106Bluff Point 69kV0BatteryWithdrawn

Jay, IN: 30 requests in the PJM queue, 10 active totaling 477.4 MW.

A substation with the same name is named in PJM transmission planning materials: Bluff Point (AEP, 1 mention).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperNextEra Energy Resources Interconnection Holdings, LLC
Transmission ownerAEP
Project typeGeneration Interconnection
CycleC01
StagePhase 1
MW energy120.0
MW capacity120.0
MFO120.0
Submitted date4/27/2026
Last updated10/5/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.