Riverstart Solar Park V
PJM queue ID AE2-219
Riverstart Solar Park V (AE2-219) is listed in the PJM interconnection queue as a 42 MW solar project in Randolph County, IN. The filing names Bluff Point-Randolph as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of July 31, 2028.
| Queue ID | AE2-219 |
|---|---|
| Project name | Riverstart Solar Park V |
| Status (as published) | Engineering and Procurement |
| Substation | Bluff Point-Randolph |
| Point of interconnection | Bluff Point-Randolph 138 kV |
| County | Randolph |
| State | IN |
| Voltage | 138 kV |
| Capacity | 42 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2028-07-31 |
| Source dataset | serial |
Same substation and county
Bluff Point-Randolph substation: 3 requests in the PJM queue, 1 active totaling 42 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AI2-112 | Bluff Point-Randolph 138 kV | 42 | Solar | Withdrawn |
| AE1-137 | Bluff Point-Randolph | 38 | Solar | Withdrawn |
Randolph, IN: 43 requests in the PJM queue, 17 active totaling 939 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 100 |
| MW capacity | 42 |
| MFO | 100 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.