Substation Scout

Cayuga Ridge South WF

PJM queue ID O51

Cayuga Ridge South WF (O51) is listed in the PJM interconnection queue as a 60 MW wind project in Livingston County, IL. The filing names Pontiac Midpoint-Wilton Center as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of May 6, 2010.

Queue IDO51
Project nameCayuga Ridge South WF
Status (as published)In Service
SubstationPontiac Midpoint-Wilton Center
Point of interconnectionPontiac Midpoint-Wilton Center 345kV
CountyLivingston
StateIL
Voltage345 kV
Capacity60 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Target commercial operation2010-05-06
Source datasetserial

Same substation and county

Livingston, IL: 47 requests in the PJM queue, 13 active totaling 1,544.4 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy300
MW capacity60
MFO300

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.