Dresden - Ponitac Midpoint 345 kV (C01-1098) is listed in the PJM interconnection queue as a 185 MW hybrid project in Livingston County, IL. The filing names Dresden - Ponitac Midpoint as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of September 14, 2029.
| Queue ID | C01-1098 |
|---|---|
| Project name | Dresden - Ponitac Midpoint 345 kV |
| Status (as published) | Active |
| Substation | Dresden - Ponitac Midpoint |
| Point of interconnection | Dresden - Ponitac Midpoint 345 kV |
| County | Livingston |
| State | IL |
| Voltage | 345 kV |
| Capacity | 185 MW |
| Resource (as published) | Solar,Storage,Hybrid |
| Resource category | Hybrid (normalized for filtering) |
| Target commercial operation | 2029-09-14 |
| Source dataset | cycle |
Same substation and county
Livingston, IL: 47 requests in the PJM queue, 13 active totaling 1,544.4 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | CPV Prairie Dock Solar, LLC |
|---|---|
| Transmission owner | ComEd |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 185.0 |
| MW capacity | 185.0 |
| MFO | 185.0 |
| Submitted date | 4/27/2026 |
| Last updated | 6/18/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.