Substation Scout

Tap Savana to Seabreeze - Ckt 27 substation interconnection queue

3 active projects totaling 809.8 MW in the ERCOT queue.

3 ERCOT queue filings name Tap Savana to Seabreeze - Ckt 27 as the point of interconnection, all in Brazoria County, TX.

Target commercial operation date as filed: Jun 2029 (3 filings). 3 active filings target a date after November 27, 2026.

Interconnecting entity as filed: Austin Bayou Solar, LLC (3 filings).

3active projects
809.8active MW
3total filed
Queue IDProjectkVMWResourceStatusTarget COD
25INR0102 Austin Bayou Solar 345 502.5 Solar SS Completed, FIS Started, IA Jun 2029
25INR0237 Austin Bayou Storage III 345 156.6 Battery SS Completed, FIS Started, IA Jun 2029
25INR0235 Austin Bayou Storage I 345 150.7 Battery SS Completed, FIS Started, IA Jun 2029

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.

Other ERCOT queue substations in Brazoria County, TX

All 63 ERCOT queue filings in Brazoria County, TX.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first