Angleton substation interconnection queue

2 active projects totalling 635.5 MW in the ERCOT queue.

2active projects
635.5active MW
2total filed
Queue IDProjectkVMWResourceStatus
19INR0041 Myrtle Solar 138 321.2 Solar SS Completed, FIS Completed, IA
27INR0636 Myrtle Solar Repower 138 314.3 Solar SS Completed, FIS Completed, No IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.