Tap Angleton - Clute substation interconnection queue
2 active projects totaling 0 MW in the ERCOT queue.
2 ERCOT queue filings name Tap Angleton - Clute as the point of interconnection, all in Brazoria County, TX.
Target commercial operation date as filed: Apr 2029 (2 filings). 2 active filings target a date after November 27, 2026.
Interconnecting entity as filed: Oyster Creek Solar 1, LLC (2 filings).
2active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| 26INR0117 | Oyster Creek Solar I SLF | 138 | 0 | Solar | SS Completed, FIS Started, No IA | Apr 2029 |
| 26INR0118 | Oyster Creek Storage I SLF | 138 | 0 | Battery | SS Completed, FIS Started, No IA | Apr 2029 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.
Other ERCOT queue substations in Brazoria County, TX
- Tap Savana to Seabreeze - Ckt 27: 3 active, 809.8 MW of 3 filed
- Angleton: 2 active, 635.5 MW of 2 filed
- TNMP FM524 Substation: 2 active, 622 MW of 2 filed
- tap Rosharon - Winmil: 3 active, 358 MW of 3 filed
- Tap SANBER_POI_8 (Bus# ) to WEST COLUMBIA (Bus# ) Ckt 60 Line: 2 active, 100.2 MW of 2 filed