Substation Scout

TNMP FM524 Substation substation interconnection queue

2 active projects totaling 622 MW in the ERCOT queue.

2 ERCOT queue filings name TNMP FM524 Substation as the point of interconnection, all in Brazoria County, TX.

Target commercial operation dates as filed run from Dec 2027 to Sep 2030 (2 filings). 2 active filings target a date after November 27, 2026.

Interconnecting entity as filed: Bulldog Power LLC (1 filing), Bulldog Power II LLC (1 filing).

2active projects
622active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
27INR0095 Bulldog Power 138 311 Gas SS Completed, FIS Completed, No IA Dec 2027
30INR0073 Bulldog Power II 138 311 Gas SS Completed, FIS Started, No IA Sep 2030

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.

Other ERCOT queue substations in Brazoria County, TX

All 63 ERCOT queue filings in Brazoria County, TX.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first