TNMP FM524 Substation substation interconnection queue

2 active projects totalling 622 MW in the ERCOT queue.

2active projects
622active MW
2total filed
Queue IDProjectkVMWResourceStatus
27INR0095 Bulldog Power (TEF - Due Diligence) 138 311 Gas SS Completed, FIS Completed, No IA
30INR0073 Bulldog Power II 138 311 Gas SS Completed, FIS Started, No IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.