TNMP FM524 Substation substation interconnection queue
2 active projects totaling 622 MW in the ERCOT queue.
2 ERCOT queue filings name TNMP FM524 Substation as the point of interconnection, all in Brazoria County, TX.
Target commercial operation dates as filed run from Dec 2027 to Sep 2030 (2 filings). 2 active filings target a date after November 27, 2026.
Interconnecting entity as filed: Bulldog Power LLC (1 filing), Bulldog Power II LLC (1 filing).
2active projects
622active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| 27INR0095 | Bulldog Power | 138 | 311 | Gas | SS Completed, FIS Completed, No IA | Dec 2027 |
| 30INR0073 | Bulldog Power II | 138 | 311 | Gas | SS Completed, FIS Started, No IA | Sep 2030 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.
Other ERCOT queue substations in Brazoria County, TX
- Tap Savana to Seabreeze - Ckt 27: 3 active, 809.8 MW of 3 filed
- Angleton: 2 active, 635.5 MW of 2 filed
- tap Rosharon - Winmil: 3 active, 358 MW of 3 filed
- Tap SANBER_POI_8 (Bus# ) to WEST COLUMBIA (Bus# ) Ckt 60 Line: 2 active, 100.2 MW of 2 filed
- Tap Angleton - Clute: 2 active, 0 MW of 2 filed