Tap SANBER_POI_8 (Bus# ) to WEST COLUMBIA (Bus# ) Ckt 60 Line substation interconnection queue
2 active projects totalling 100.2 MW in the ERCOT queue.
2active projects
100.2active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| 20INR0248 | DAMAZO (Second Division) SOLAR | 138 | 100.2 | Solar | SS Completed, FIS Completed, IA |
| 25INR0378 | Second Division Storage | 138 | 0 | Battery | SS Completed, FIS Started, No IA |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.