Tap SANBER_POI_8 (Bus# ) to WEST COLUMBIA (Bus# ) Ckt 60 Line substation interconnection queue

2 active projects totaling 100.2 MW in the ERCOT queue.

2 ERCOT queue filings name Tap SANBER_POI_8 (Bus# ) to WEST COLUMBIA (Bus# ) Ckt 60 Line as the point of interconnection, all in Brazoria County, TX.

Target commercial operation date as filed: Dec 2025 (2 filings).

Interconnecting entity as filed: TX Gulf Solar 1 LLC (1 filing), Mound Creek Storage, LLC (1 filing).

2active projects
100.2active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
20INR0248 DAMAZO (Second Division) SOLAR 138 100.2 Solar SS Completed, FIS Completed, IA Dec 2025
25INR0378 Second Division Storage 138 0 Battery SS Completed, FIS Started, No IA Dec 2025

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.

Other ERCOT queue substations in Brazoria County, TX

All 63 ERCOT queue filings in Brazoria County, TX.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first