Tap SANBER_POI_8 (Bus# ) to WEST COLUMBIA (Bus# ) Ckt 60 Line substation interconnection queue

2 active projects totalling 100.2 MW in the ERCOT queue.

2active projects
100.2active MW
2total filed
Queue IDProjectkVMWResourceStatus
20INR0248 DAMAZO (Second Division) SOLAR 138 100.2 Solar SS Completed, FIS Completed, IA
25INR0378 Second Division Storage 138 0 Battery SS Completed, FIS Started, No IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.