Tap SANBER_POI_8 (Bus# ) to WEST COLUMBIA (Bus# ) Ckt 60 Line substation interconnection queue
2 active projects totaling 100.2 MW in the ERCOT queue.
2 ERCOT queue filings name Tap SANBER_POI_8 (Bus# ) to WEST COLUMBIA (Bus# ) Ckt 60 Line as the point of interconnection, all in Brazoria County, TX.
Target commercial operation date as filed: Dec 2025 (2 filings).
Interconnecting entity as filed: TX Gulf Solar 1 LLC (1 filing), Mound Creek Storage, LLC (1 filing).
2active projects
100.2active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| 20INR0248 | DAMAZO (Second Division) SOLAR | 138 | 100.2 | Solar | SS Completed, FIS Completed, IA | Dec 2025 |
| 25INR0378 | Second Division Storage | 138 | 0 | Battery | SS Completed, FIS Started, No IA | Dec 2025 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.
Other ERCOT queue substations in Brazoria County, TX
- Tap Savana to Seabreeze - Ckt 27: 3 active, 809.8 MW of 3 filed
- Angleton: 2 active, 635.5 MW of 2 filed
- TNMP FM524 Substation: 2 active, 622 MW of 2 filed
- tap Rosharon - Winmil: 3 active, 358 MW of 3 filed
- Tap Angleton - Clute: 2 active, 0 MW of 2 filed